Institution/Contact
Information |
Project/Procurement Opportunity |
NAICS Categories |
Project Size (approx./estimated) |
Consideration/Note/ |
Contact Information: Janelle Turner- 314-935-6811 Please Register your company on our portal @ |
Wilson Hall Chiller |
Mechanical, but could be GC |
$500,000-$1,500,000 |
Pre-qual required: includes project history, references, union affiliations and certifications, financial statements, certificate of insurance, and bonding capacity |
Francis Field Bleachers |
Concrete |
$700,000 |
Pre-qual required: includes project history, references, union affiliations and certifications, financial statements, certificate of insurance, and bonding capacity |
|
Simon Hall (courtyard landscaping/renovation) |
Landscape Pavers |
$300,000 |
Pre-qual required: includes project history, references, union affiliations and certifications, financial statements, certificate of insurance, and bonding capacity |
|
Women’s Building Roof |
Roofing |
$800,000 |
Pre-qual required: includes project history, references, union affiliations and certifications, financial statements, certificate of insurance, and bonding capacity |
|
Sumers Rec (shell space buildout) |
GC – TBD Mechanical Electrical Architecture Fire Protection |
$2.3M |
Build relationships with GC before project begins. GC may have different qual/certs compared to WashU. |
|
WUSM Ambulatory Cancer Center |
GC – Clayco Concrete Structural steel Erection Masonry |
$200M |
Build relationships with Sandra Marks before project begins. Clayco may have different qual/certs compared to WashU. Subcontractor Pre-Qual - Clayco (claycorp.com) |
|
Promotional products |
|
|
Pre-qual includes fair labor association engagement, social and environmental sustainability programs (incl living wage, code of conducts, forced labor, etc), and supply chain mapping. WashU will conduct a forum to provide more information on criteria and resources to help meet criteria 1Q '22 |
|
Catering services |
Food services |
Multiple/various sizes |
|
|
Ground transportation services |
Transportation |
Various |
|
|
Institution/Contact Information |
Project/Procurement Opportunity |
NAICS Categories |
Project Size (approx./estimated) |
Consideration/Note/ |
Contact information: Dr. Stephanie Smith Supplier Diversity Manager Ken Kempf – Facilities KeJuan Torrence –
Purchasing |
Campus Transformation Projects |
Construction / General Services |
|
|
Deferred Maintenance |
Construction / General Services |
|
|
|
Interior Renovations |
Construction / General Services |
|
|
|
CC – Retention Pond Repairs |
Construction / General Services |
|
|
|
FP – West Wing Skylight &
Façade Repairs |
|
|
|
|
FV-Theatre Rigging & Video Equipment Replacement |
General Services / Goods |
|
|
|
M - Theatre Rigging &
Seating Replacement |
General Services / Goods |
|
|
|
District-wide Classroom Furniture Replacement |
Goods |
|
|
|
FP– Structural
Concrete/Waterproofing Repairs |
General Services / Goods |
|
|
|
M – Structural Concrete / Waterproofing |
General Services / Goods |
|
|
|
Institution/Contact Information |
Project/Procurement Opportunity |
NAICS Categories |
Project Size (approx./estimated) |
Consideration/Note/ |
Contact Information: Construction
Projects Emily Baize Space Planner UMSL Procurement
Projects Teresa Vest Associate Director UM Procurement vestt@umsystem.edu |
Signage/Donor Wall |
|
$10,000 - $20,000 |
Would require low-risk insurance; may require approval for use of
university logos/design work |
Promotional Items |
Variety |
Various promotional items, t-shirts, trophies/awards |
On-going, as needed basis; may require approval for use of university logos |
|
Campus Grass Mowing |
|
$150,000/annually |
Requires insurance |
|
Snow removal at off-site properties (Approx. 10 properties) |
|
Approx. $35,000/annually |
Requires insurance |
|
Campus Pond
Maintenance |
|
Approx.
$25,000/annually |
Requires insurance |
|
Kitchen Cabinet Replacements/ Mansion Hill |
|
$25,000 |
Requires insurance |
|
Institution/Contact Information |
Project/Procurement Opportunity |
NAICS Categories |
Project Size (approx./estimated) |
Consideration/Note/ |
Harris-Stowe State University Contact
Information: Corey
Freeman University
Buyer |
Facilities Services ‐
HVAC ‐
Boilers ‐
Chillers ‐
Air
handlers ‐
Electrician ‐
Plumber |
|
|
|
Center for
Innovation & Entrepreneurship (CIE) |
Construction/General
Services |
|
Out for Bid – March
2022 |
|
Roof Replacements |
Roofing |
|
|
|
Basketball Court
& Pavilion |
Construction/General
Services |
|
Out for Bid – March
14, 2022 |
|
Janitorial Services |
|
|
Out for Bid – November 2021 |
|
Abatement Services ‐
Science Lab ‐
CIE |
|
|
Out for Bid –
Jan/Feb 2022 |
|
Library Renovation |
Construction/General Services |
|
Out for Bid – Jan/Feb 2022 |
|
Institution/Contact Information |
Project/Procurement Opportunity |
NAICS Categories |
Project Size (approx./estimated) |
Consideration/Note/ |
Contact
Information: Jeff
Hovey Sr.
Director, Business Services Ellen
Borowiak Contracts
Program Manager Dustin Montgomery Assistant Director, Facilities https://www.slu.edu/business-finance/index.php |
Catering Vendors |
Catering/Food Service |
Ongoing need, size of engagement varies |
To be selected by internal departments. |
Local movers for office relocations |
Household and Office Goods Moving |
Ongoing needed, size of engagement varies |
|
|
Large building
construction & ancillary/related projects |
All facets of
building construction |
Variable amounts,
based on specific project. Need
through 2023 |
To be bid through
general contractor, McCarthy, under direction of SLU Design &
Construction Team |
|
SLUCare Tenant Improvements |
Improvements to clinical spaces at various SLUCare locations in STL metro area |
2-3 opportunities, range of $10,000-$100,000 |
To be bid by SLU, Design & Construction
Team |
|
Various Facilities
Services Projects, related to HVAC including replacement of Air Handlers,
Boilers, Chillers and Cooling Towers |
- Air Handler Replacement - Boiler Replacement - Cooling Tower Renewal - Chiller Replacement
|
5-10 opportunities,
range of $50,000- $350,000 |
To be bid by SLU,
Design & Construction Team |
|
Institution/Contact Information |
Project/Procurement Opportunity |
NAICS Categories |
Project Size (approx./estimated) |
Consideration/Note/ |
Contact
Information: Candace
Bingham Scan
here to register as a Saint Louis Zoo vendor and receive notices of upcoming
opportunities. |
Emergency Facilities Management Services- Automatic Door & Gate, Electrical, Elevator,
Fire Alarm Testing, Fire Sprinkler/ Backflow, HVAC/Boiler, Plumbing, Roof,
Tree Maintenance |
|
undetermined |
Spring 2022- 2 year
agreement with 2 year option to extend |
Saint
Louis Zoo Re-Roofing of the Antelope House |
roofing,
demolition, concrete, rough carpentry csi
code-division 2,3,6,7 |
undetermined |
December 2021 |
|
Saint Louis Zoo WildCare
Park:
Headquarters Renovation work |
14,10, 22, 23, 26, 2, 5, 6, 31, 32, 33, |
undetermined |
Alberici –CM as Constructor on
this project. See their bidding opportunities page. https://alberici.com/subcontractors/bid-opportunities/ |
|
2022
stlzoo Magazine- Printing of 4 issues of the stlzoo Magazine |
printing
services |
undetermined |
January
2022 |
|
Zoo Map Brochure |
printing services |
undetermined |
November 2021 |
|
2023
Zoo Calendar |
printing
services |
undetermined |
July
2022 |
|
Storage Area Network -Evaluate and
replace existing storage arrays that hold all application and environmental
data. Additional, The St. Louis Zoo is looking to replace their current
NetApp Cluster DataOnTap architecture with new technology which allows
support for the latest application and OS software such as VMware vSphere 7.
All types of solutions will be considered (replacement of existing systems,
additions to existing systems, hardware based replication, appliance based
replication, and software based replication |
technology |
undetermined |
Winter
2022 |
|
PCI-- • Assistance with completion of the Self-Assessment
Questionnaire latest version and other PCI advisory assistance, as
requested. This may include
development or enhancement of policies and procedures, verification and
validation of controls, and other activities, as directed by the Zoo • The
performance of external penetration test on the Zoo’s IT environment, which
includes external IP addresses. • The
performance of internal penetration test on the Zoo’s IT environment, with a
scope that includes servers, workstations, and networks • The performance of a formal risk
assessment, which identifies threats and vulnerabilities. |
technology |
undetermined |
December 2021 |
|
Institution/Contact
Information |
Project/Procurement Opportunity |
NAICS Categories |
Project Size
(approx./estimated) |
Consideration/Note/ |
Contact Information: Anna Muchow Strategic Sourcing Manager, Purchased Services Team |
BJC will be transitioning janitorial service volume
to diverse vendors at select Medical Office Buildings |
Janitorial
Services (EVS) |
Approximately $1M |
Timeframe: Implementation
December 2021 |
Promotional Items |
Promotional Items |
|
|
|
Catering for Special Events |
Food Services |
|
|
|
Institution/Contact
Information |
Project/Procurement Opportunity |
NAICS Categories |
Project Size
(approx./estimated) |
Consideration/Note/ |
Contact Information: Geralyn Lynch Ralph Powell Jr. Precious Jackson-Howlett,
Diversity Manager, Alberici: pjackson@alberici.com Eric Christner,
President: Musick Construction EricC@musickconstruction.com |
Mercy Hospital St Louis:
Replacement of Linear Accelerator and construction renovation to support new
equipment. |
Subcontractor work including demo, rough
and finish carpentry, millwork, MEP, finishes |
$3,000,000 |
Work through Mercy preferred general contractors.
COVID vaccine required. Union affiliations
needed. Insurance and bonding based on
project and general contractor/construction manager. |
Mercy Hospital South: 1)
Orthopedic
Clinic Expansion, in the Southfork building adding
space to accommodate 2 new providers and new X-ray unit. 2)
Hospital
cafeteria line improvements |
Subcontractor work including demo, rough and
finish carpentry, millwork, MEP, finishes |
$2,000,000 $640,000 |
Work through Mercy preferred general
contractors. COVID vaccine required. Union affiliations needed. Insurance and bonding based on project and
general contractor/construction manager. |
|
Mercy Hospital Washington: 1)
Relocation of
endoscope processing to move reprocessing closer to the procedure area and
improve workflow 2) Expansion of
the cath lab department includes new Cath procedure
room |
Subcontractor work including demo, rough and finish carpentry,
millwork, MEP, finishes |
$350,000 $3,700,000 |
Work through Mercy preferred general contractors. COVID vaccine
required. Union affiliations
needed. Insurance and bonding based on
project and general contractor/construction manager. |
|
Institution/Contact
Information |
Project/Procurement Opportunity |
NAICS Categories |
Project Size
(approx./estimated) |
Consideration/Note/ |
Contact Information: Reuben Hamilton, Jr. |
Advertising/Mktg Communications; Graphic Design Services |
541810, 541613 541430 |
To be determined but local to St. Louis |
Registration, Diverse Business
Certification, Insurance, Self-Preforming, accept purchase orders, focused on
health and safety |
Linen & Mat
Cleaning Services Linen Transportation Services |
812320 484220 |
Same as above |
Same as above |
|
Interior Construction Services |
236220 |
Same as above |
Same as above |
|
Building Maintenance
Services |
811310 |
Same as above |
Same as above |
|
Water & Sewer Services |
237110 |
Same as above |
Same as above |
|
Plumbing Services Heating Services HVAC Services |
238220 238220 238220 |
Same as above |
Same as above |
|
Engineering Services |
541330 |
Same as above |
Same as above |
|
Janitorial Services |
561720 |
Same as above |
Same as above |
|
Institution/Contact Information |
Project/Procurement Opportunity |
NAICS Categories |
Project Size (approx./estimated) |
Consideration/Note/ |
St. Louis County Contact
Information: Nate
Adams, M/WBE
Program Director |
St. Louis County Police Precincts #1 and #3. Projects will be released mid November. Bids
due 30 days later. |
All building trades |
$9 M - $9.5M |
24% MBE goal and 9.5% WBE goal.
St. Louis County M/WBE Program on accepts certifications from Lambert
Airport and (MoDOT) Missouri Department of
Transportation (MoDOT) |
AR-1771 - 2021 ITS Program – North Install fiber optic interconnect, PTZ cameras,
signal equipment, optimization of signal timing. Bid date 11/03/21 |
Fiber optics installation |
$1. 04 M |
Federal Funded Project. DBE goal set by MoDOT |
|
AR-1497 - McKelvey Road Resurfacing - Phase I. Resurfacing and
Pedestrian Upgrades. Bid date
11/17/21. |
Transportation/Road
project. |
$1.3 M |
Federal Funded
Project. DBE goal set by MoDOT |
|
AR-1683 - Ballas Road
Resurfacing and Pedestrian Upgrades.
Bid date 11/17/21. |
Transportation/Road project. |
$1. 5 M |
Federal Funded Project. DBE goal set by MoDOT |
|
CR-1831 - 2020 CRS Collector Overlay Area C. Asphalt overlay, curb
repair, pedestrian facility upgrades, and ADA curb ramp construction (Hanna
Rd., Valcour Ave., and Eddie & Pard Rd.) Bid date
early 2022. |
Transportation/ |
$1.4 M |
24% MBE goal and 9.5%
WBE goal. St. Louis County M/WBE
Program on accepts certifications from Lambert Airport and (MoDOT) Missouri Department of Transportation (MoDOT) |
|
CR 1830 - 2020 CRS Collector Overlay Area B. Asphalt overlay, curb repair, pedestrian
facility upgrades, and ADA curb ramp construction (Keller Rd., Suson Hills Dr. and Pottle Ave.) Bid date early 2022. |
Transportation/Road project. |
$2.75 M |
24% MBE goal and 9.5% WBE goal. St. Louis County M/WBE Program on accepts
certifications from Lambert Airport and (MoDOT)
Missouri Department of Transportation (MoDOT) |
|
AR-1554 - Dielman
Road ARS Infrastructure. Resurfacing, pedestrian upgrades, ITS work. Bid date early 2022. |
Transportation/Road
project. |
$1.3 M |
Federal Funded
Project. DBE goal set by MoDOT |
|
AR-1817 - 2020Asphalt paving, concrete replacement,
and other infrastructure repairs ARS Improvements Area A. Spring 2022 |
Transportation/Road project. |
$3.1 M |
24% MBE goal and 9.5% WBE goal. St. Louis County M/WBE Program on accepts
certifications from Lambert Airport and (MoDOT)
Missouri Department of Transportation (MoDOT) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|